logo

ECLIPS Container Roll Out Solar System (CROSS)

Sector: Car parking • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The ECLIPS Container Roll Out Solar System (CROSS) project includes the detailed design, manufacture and testing of the Container Roll Out Solar System. CROSS is a factory assembled relocatable PV solar ground array. The CROSS development includes 20ft and 40ft configurations (CROSS20 and CROSS40).The CROSS20 has a maximum output of 2,175W, and the CROSS40 produces up to 4,350W, and can be transpo

Project Information FAQ

Project Information

5 Q
The project “ECLIPS Container Roll Out Solar System (CROSS)” is an infrastructure initiative in the Car parking sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The ECLIPS Container Roll Out Solar System (CROSS) project includes the detailed design, manufacture and testing of the Container Roll Out Solar System. CROSS is a factory assembled relocatable PV solar ground array. The CROSS development includes 20ft and 40ft configurations (CROSS20 and CROSS40).The CROSS20 has a maximum output of 2,175W, and the CROSS40 produces up to 4,350W, and can be transported inside standard shipping containers.The CROSS products are being tested in Canberra, and the project will conclude with a Demonstration Day being held at Exhibition Park in Canberra (EPIC) on 12 April 2018.The project aims to demonstrate rapid handling of the CROSS system by standard material handling equipment equipment, and validate the scale of the temporary power market opportunity. The ECLIPS Container Roll Out Solar System (CROSS) project recognises a gap in the Australian market for the provision of renewable energy systems at small-commercial scale (100-500 kW), which can be highly mobile and/or temporarily deployed (at timescales of months up to five years). Renewable energy systems which meet this need could be deployed in off-grid and fringe-of-grid areas, and have the potential to offset diesel consumption and improve the security of existing networks. The logistics efficiencies represented by CROSS also reduce some of the barriers to entry for potential renewable power users in remote locations, including short project durations and where power systems need to be periodically relocated.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data