Eco Material Technologies Lakeview Plant
The owner, status and timeline of this project. A free account opens every field.
Source: CemNet.com
Eco Material Technologies opened its Lakeview plant in southern Oregon, USA, with a capacity of 0.3 million tonnes per annum of low-carbon cement replacements. The plant produces supplementary cementitious materials and proprietary green cement blends that can reduce the carbon footprint of concrete by up to 80%.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Cement
- Location
- Lakeview, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- CemNet.com
ConstructChat
Ask ConstructChat about Eco Material Technologies Lakeview Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Eco Material Technologies opened its Lakeview plant in southern Oregon, USA, with a capacity of 0.3 million tonnes per annum of low-carbon cement replacements. The plant produces supplementary cementitious materials and proprietary green cement blends that can reduce the carbon footprint of concrete by up to 80%. |
Original sector | Built Sector |
Location
Country | United States of America (USA) |
State | Oregon |
City | Lakeview |
Source
Source | CemNet.com |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Cement |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in USA
- Daniel Webster Western Beltway Resurfacing Improvements
- Central West Central Florida DMS CCTV Camera Installation
- Floridas TurnpikeSR 91 and Claude Pepper Memorial HighwayUS 27 Interchange Improvements Project
- Turnpike Resurfacing and Improvements MP 190 to MP 198
- Turnpike Roadside and Safety Improvements CR 470 to I75
- Turnpike Resurfacing Improvements MP 260 to MP 265
- FY25 standing request for tree care - pruning, removals, stump grinding, chemical injections, etc.
- Widen Sawgrass from North of Oakland Park Blvd to South of Atlantic Blvd
