logo

Eco Power Alupola & Badulu Oya SHPPs

Sector: Hydro • Location: Sri Lanka

Source: World Bank Group

Project
Active

Eco Power (EPL), from Sri Lanka, was developing two mini hydropower plants, Alupola and Badulu Oya, of 2.4 and 5.8MW respectively. Annual output of a combined 37GWh was expected. The name of the project company of Badulu Oya was Highland Energy Developments Pvt. Ltd. The location of the projects is:

Badulu Oya: Uva Province, Badulla District Alupola: Sabaragamuwa Province, Ratnapura District

Project Information FAQ

Project Information

4 Q
The project “Eco Power Alupola & Badulu Oya SHPPs” is an infrastructure initiative in the Hydro sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Eco Power (EPL), from Sri Lanka, was developing two mini hydropower plants, Alupola and Badulu Oya, of 2.4 and 5.8MW respectively. Annual output of a combined 37GWh was expected. The name of the project company of Badulu Oya was Highland Energy Developments Pvt. Ltd. The location of the projects is: Badulu Oya: Uva Province, Badulla District Alupola: Sabaragamuwa Province, Ratnapura District Output was to be sold to the Ceylon Electricity Board, through a standard PPA for <10MW. The capacity factor of Badulu Oya was expected to be 58%. For Alupola this was 57.7%. Expected operational life was 30 years. Construction started in March 2003 (Alupola) and January 2003 (Badulu Oya). Commissioning was expected for June 2004 (Alupola) and June 2007 (Badulu Oya). Financing was to come from commercial banks. Total cost was unknown, but estimated at 8.2 million. Financial closure date was unknown, but estimated at June 2004 (construction completion Alupola). Coordinates: Badulu Oya: Longitude / Latitude: N 70 8.5’ /E 810 0.6’ Alupola: Longitude / Latitude: N 6degrees 41.5’ / E 80degrees 32.5’ http://cdm.unfccc.int/filestorage/1/L/F/1LF70D3E3O4NDPP9OG1VHZBHM2TS6M1/PDD%20-%20Alupola%20Badulu%20hydropower%20projects.pdf?t=ZG58bWV1YXQ3fDASnemwj0Q5inRw56TJHPeR

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data