logo

Eco Power Atabage & Kolapatana SHPPs

Sector: Wind • Location: Sri Lanka

Source: World Bank Group

Project
Active

Eco Power was listed in the CDM documentation as the principal developer of the 2.24MW Atabage and 1.14MW Kolapatana run-of-river small hydropower plants. Atabage is located in Gampola. Kolapatana is located in Nawalapitiya. Both are in Kandy District, Central Province. Kolapatana utilized 1 Francis turbine, and 1 Turgo turbine. Atabage utilized 1 Francis Turbine.

According to CDM documentatio

Project Information FAQ

Project Information

4 Q
The project “Eco Power Atabage & Kolapatana SHPPs” is an infrastructure initiative in the Wind sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Eco Power was listed in the CDM documentation as the principal developer of the 2.24MW Atabage and 1.14MW Kolapatana run-of-river small hydropower plants. Atabage is located in Gampola. Kolapatana is located in Nawalapitiya. Both are in Kandy District, Central Province. Kolapatana utilized 1 Francis turbine, and 1 Turgo turbine. Atabage utilized 1 Francis Turbine. According to CDM documentation, Kolapatana was expected to be commissioned in August 2006. Atabage was expected to be commissioned in November 2004. The output was sold to the Ceylon Electricity Board. Total cost was unknown, but estimated at US$1 million/MW (conservative), US$3.4 million. The project applied for UNFCCC CDM financing, together with Upper Watawala, Agra Oya, and Galatha Oya. All reported separately. Financial closure date was unknown, but ESTIMATED was November 2004, commissioning of Atabage. The coordinates are: Kolapatana: N 6° 59.75’ E 80° 36.00” Atabage: N 7º 08.39’ E 80º 36.31’ http://www.dnv.com/focus/climate_change/Upload/PDD%20-%20New%20Projects%20%20-%20UAKAG%20-%20Nov%209%20%202006.pdf

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data