Eco Power Hulu Ganga SHPPs
Sector: Hydro • Location: Sri Lanka
Source: World Bank Group
Eco Power (Pvt.) Ltd, from Sri Lanka, developed the 3.0MW Hulu Ganga 1 and 2.95MW Hulu Ganga 2 small hydropower plants (run-of-river). The projects consisted of Francis turbines. The capacity factor of plant 1 was expected to be 39.4%, and 44% for plant 2. Annual output was expected to be 10.3GWh and 11.3GWh respectively, totaling 21.6GWh.
Output was sold to the Ceylon Electricity Board (CEB),
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Eco Power (Pvt.) Ltd, from Sri Lanka, developed the 3.0MW Hulu Ganga 1 and 2.95MW Hulu Ganga 2 small hydropower plants (run-of-river). The projects consisted of Francis turbines. The capacity factor of plant 1 was expected to be 39.4%, and 44% for plant 2. Annual output was expected to be 10.3GWh and 11.3GWh respectively, totaling 21.6GWh. Output was sold to the Ceylon Electricity Board (CEB), via Standard Power Purchase Agreements under 10MW. Construction of plant 1 started in April 2002 and was expected to be completed in June 2003. Plant 2 was expected to start construction in March 2004, with commissioning in January 2006. The operational life was expected to be 30 years. According to UNFCCC the project already received CERs from January 2003, which seems to be before construction started. More info required. Financing came from the sponsor and from domestic commercial banks. Financial closure date was unknown, but estimated at June 2003 (commissioning plant 1). Project coordinates: Hulu Ganga Phase I Small Hydropower Project Longitude N 7o 23.5’ / Latitude E 80o 44.8’ Hulu Ganga Phase II Small Hydropower Project Longitude N 7o 23.3’ / Latitude E 80o 44.5’ http://cdm.unfccc.int/filestorage/S/Z/M/SZMFZE9E63CZ6KENAKH7ZA0KZBMZOD/Monitoring%20Report%20of%20Hapugastenne%20and%20Hulu%20Ganga%20Small%20Hydropower%20Projects.pdf?t=bll8bWV2a2hjfDDWjBDpIhDUUiTIGgmVEfFO http://cdm.unfccc.int/filestorage/3/O/B/3OBEQNHZHQCW75W6W2OQFFRDDLPNUD1/PDD%20-%20Hapu%20and%20Hulu%20hydropower%20projects.pdf?t=UVV8bWV2a2g0fDDkFPplmZUZJfzmlJ5lwRQ1 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
