Eco Power Hulu Ganga SHPPs
Sector: Commercial • Location: Kandy, Sri Lanka
Source: World Bank Group
Eco Power (Pvt.) Ltd, from Sri Lanka, developed the 3.0MW Hulu Ganga 1 and 2.95MW Hulu Ganga 2 small hydropower plants (run-of-river). The projects consisted of Francis turbines. The capacity factor of plant 1 was expected to be 39.4%, and 44% for plant 2. Annual output was expected to be 10.3GWh and 11.3GWh respectively, totaling 21.6GWh.
Output was sold to the Ceylon Electricity Board (CEB),
- Status
- Prospective
- Sector
- Commercial, Wind, Hydro, Power Generation (CCGT), Government
- Location
- Kandy, Sri Lanka
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Eco Power Hulu Ganga SHPPs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Eco Power (Pvt.) Ltd, from Sri Lanka, developed the 3.0MW Hulu Ganga 1 and 2.95MW Hulu Ganga 2 small hydropower plants (run-of-river). The projects consisted of Francis turbines. The capacity factor of plant 1 was expected to be 39.4%, and 44% for plant 2. Annual output was expected to be 10.3GWh and 11.3GWh respectively, totaling 21.6GWh. Output was sold to the Ceylon Electricity Board (CEB), via Standard Power Purchase Agreements under 10MW. Construction of plant 1 started in April 2002 and was expected to be completed in June 2003. Plant 2 was expected to start construction in March 2004, with commissioning in January 2006. The operational life was expected to be 30 years. According to UNFCCC the project already received CERs from January 2003, which seems to be before construction started. More info required. Financing came from the sponsor and from domestic commercial banks. Financial closure date was unknown, but estimated at June 2003 (commissioning plant 1). Project coordinates: Hulu Ganga Phase I Small Hydropower Project Longitude N 7o 23.5’ / Latitude E 80o 44.8’ Hulu Ganga Phase II Small Hydropower Project Longitude N 7o 23.3’ / Latitude E 80o 44.5’ http://cdm.unfccc.int/filestorage/S/Z/M/SZMFZE9E63CZ6KENAKH7ZA0KZBMZOD/Monitoring%20Report%20of%20Hapugastenne%20and%20Hulu%20Ganga%20Small%20Hydropower%20Projects.pdf?t=bll8bWV2a2hjfDDWjBDpIhDUUiTIGgmVEfFO http://cdm.unfccc.int/filestorage/3/O/B/3OBEQNHZHQCW75W6W2OQFFRDDLPNUD1/PDD%20-%20Hapu%20and%20Hulu%20hydropower%20projects.pdf?t=UVV8bWV2a2g0fDDkFPplmZUZJfzmlJ5lwRQ1 |
Original sector | Energy |
Budget |
Location
Country | Sri Lanka |
State | Kandy |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Wind, Hydro, Power Generation (CCGT), Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
