logo

Eco Power Hulu Ganga SHPPs

Sector: Commercial • Location: Kandy, Sri Lanka

Source: World Bank Group

Project
Active

Eco Power (Pvt.) Ltd, from Sri Lanka, developed the 3.0MW Hulu Ganga 1 and 2.95MW Hulu Ganga 2 small hydropower plants (run-of-river). The projects consisted of Francis turbines. The capacity factor of plant 1 was expected to be 39.4%, and 44% for plant 2. Annual output was expected to be 10.3GWh and 11.3GWh respectively, totaling 21.6GWh.

Output was sold to the Ceylon Electricity Board (CEB),

Status
Prospective
Sector
Commercial, Wind, Hydro, Power Generation (CCGT), Government
Location
Kandy, Sri Lanka
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Eco Power Hulu Ganga SHPPs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Eco Power Hulu Ganga SHPPs” is an infrastructure initiative in the Commercial sector, located in Kandy, Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Eco Power (Pvt.) Ltd, from Sri Lanka, developed the 3.0MW Hulu Ganga 1 and 2.95MW Hulu Ganga 2 small hydropower plants (run-of-river). The projects consisted of Francis turbines. The capacity factor of plant 1 was expected to be 39.4%, and 44% for plant 2. Annual output was expected to be 10.3GWh and 11.3GWh respectively, totaling 21.6GWh. Output was sold to the Ceylon Electricity Board (CEB), via Standard Power Purchase Agreements under 10MW. Construction of plant 1 started in April 2002 and was expected to be completed in June 2003. Plant 2 was expected to start construction in March 2004, with commissioning in January 2006. The operational life was expected to be 30 years. According to UNFCCC the project already received CERs from January 2003, which seems to be before construction started. More info required. Financing came from the sponsor and from domestic commercial banks. Financial closure date was unknown, but estimated at June 2003 (commissioning plant 1). Project coordinates: Hulu Ganga Phase I Small Hydropower Project Longitude N 7o 23.5’ / Latitude E 80o 44.8’ Hulu Ganga Phase II Small Hydropower Project Longitude N 7o 23.3’ / Latitude E 80o 44.5’ http://cdm.unfccc.int/filestorage/S/Z/M/SZMFZE9E63CZ6KENAKH7ZA0KZBMZOD/Monitoring%20Report%20of%20Hapugastenne%20and%20Hulu%20Ganga%20Small%20Hydropower%20Projects.pdf?t=bll8bWV2a2hjfDDWjBDpIhDUUiTIGgmVEfFO http://cdm.unfccc.int/filestorage/3/O/B/3OBEQNHZHQCW75W6W2OQFFRDDLPNUD1/PDD%20-%20Hapu%20and%20Hulu%20hydropower%20projects.pdf?t=UVV8bWV2a2g0fDDkFPplmZUZJfzmlJ5lwRQ1

Original sector

Energy

Budget

Location

Country

Sri Lanka

State

Kandy

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Hydro, Power Generation (CCGT), Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project