Eco101 Concessionaria de Rodovias
Sector: Government • Location: Brazil
Source: World Bank Group
In January 2012, the consortium Rodovia da Vitoria, comprised of the companies ECORODOVIAS INFRAESTRUTURA E LOGISTICA S/A (a subsidiary of the Brazilian group CR Almeida) and SBS ENGENHARIA E CONSTRUCOES LTDA, won in a competitive bidding the right to expand, rehabilitate and operate the 475.9 km of highway BR-101 located at the states of Bahia and Espirito Santo.
The bidding criteria was the l
- Status
- Prospective
- Sector
- Government, Road, Commercial, Manufacturing (Industrial)
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Eco101 Concessionaria de Rodovias
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In January 2012, the consortium Rodovia da Vitoria, comprised of the companies ECORODOVIAS INFRAESTRUTURA E LOGISTICA S/A (a subsidiary of the Brazilian group CR Almeida) and SBS ENGENHARIA E CONSTRUCOES LTDA, won in a competitive bidding the right to expand, rehabilitate and operate the 475.9 km of highway BR-101 located at the states of Bahia and Espirito Santo. The bidding criteria was the lowest tariff, and Rodovia da Vitoria offered toll rates that were 45.63% below the ceiling set by the federal government. Seven other groups took part in the bidding process: CONSORCIO VIA ESPÍRITO SANTO BR-101, CONSORCIO ITAUNA, CONSÓRCIO ODEBRECHT TRANSPORT - INVEPAR, TPI - TRIUNFO PARTICIPACOES E INVESTIMENTOS, CONSORCIO RODOVIA CAPIXABA, and CONSORCIO INTEGRACAO SUDESTE. The 25-year concession contract was signed in April 2013. The investment was estimated at US$ 1.8 billion (BRL 4.2 billion) over the life of the project. The sponsors created the company Eco101 Concessionaria de Rodovias S.A. to lead the project. Operations commenced in May 2013. In March 2014, the state-owned bank BNDES approved a US$ 113.9 million (BRL 267.8 million) to Eco101. In March 2016, BNDES approved an additional financing of US$ 238.2 million (BRL 882.1 million). |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Road, Commercial, Manufacturing (Industrial) |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
- ERB Candeias Thermal Power Plant
- Sol do Futuro Solar PV Plant
