logo

Ecofren Power and ISA Biomass Power Plant

One of 1,710 projects Taiyo tracks in Chhattisgarh.

Source: World Bank Group

Project
Active

Ecofren Power project was 8 MW biomass power plant located at Durg Block, Durg District, Chhattisgarh. The project became operational since October-06 and was acquired by Greenko in September 2008. The plant used rice husk, saw dust and topada pottu as the major fuel. The project is registered under CDM. The project signed a 10 year PPA with Chhattisgarh State Electricity Board CSEB (state DISCOM)

Status
Prospective
Sector
Biomass, Consumer Products, Power Generation (CCGT), Commercial, Warehouse, Government
Location
Chhattisgarh, India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Ecofren Power and ISA Biomass Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ecofren Power and ISA Biomass Power Plant” is an infrastructure initiative in the Biomass sector, located in Chhattisgarh, India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ecofren Power project was 8 MW biomass power plant located at Durg Block, Durg District, Chhattisgarh. The project became operational since October-06 and was acquired by Greenko in September 2008. The plant used rice husk, saw dust and topada pottu as the major fuel. The project is registered under CDM. The project signed a 10 year PPA with Chhattisgarh State Electricity Board CSEB (state DISCOM). Total cost of setting up of the project was estimated at US$6.4 million. ISA Power project was 8MW biomass power plant located at Kurud Bloch, Dhamthari District, Chhattisgarh. The project is operational since August-06 and was acquired by Greenko in September 2008. The plant used rice husk, saw dust and sal doc as the major fuel. The project is registered under CDM. The project has a 10 year PPA with CSEB (state DISCOM). Total cost of setting up of the project was estimated at US$6.4 million.

Original sector

Energy

Budget

Location

Country

India

State

Chhattisgarh

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Consumer Products, Power Generation (CCGT), Commercial, Warehouse, Government

Article published date

2024-05-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project