logo

Ecofren Power and ISA Biomass Power Plant

Sector: Warehouse • Location: India

Source: World Bank Group

Project
Active

Ecofren Power project was 8 MW biomass power plant located at Durg Block, Durg District, Chhattisgarh. The project became operational since October-06 and was acquired by Greenko in September 2008. The plant used rice husk, saw dust and topada pottu as the major fuel. The project is registered under CDM. The project signed a 10 year PPA with Chhattisgarh State Electricity Board CSEB (state DISCOM)

Project Information FAQ

Project Information

5 Q
The project “Ecofren Power and ISA Biomass Power Plant” is an infrastructure initiative in the Warehouse sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ecofren Power project was 8 MW biomass power plant located at Durg Block, Durg District, Chhattisgarh. The project became operational since October-06 and was acquired by Greenko in September 2008. The plant used rice husk, saw dust and topada pottu as the major fuel. The project is registered under CDM. The project signed a 10 year PPA with Chhattisgarh State Electricity Board CSEB (state DISCOM). Total cost of setting up of the project was estimated at US$6.4 million. ISA Power project was 8MW biomass power plant located at Kurud Bloch, Dhamthari District, Chhattisgarh. The project is operational since August-06 and was acquired by Greenko in September 2008. The plant used rice husk, saw dust and sal doc as the major fuel. The project is registered under CDM. The project has a 10 year PPA with CSEB (state DISCOM). Total cost of setting up of the project was estimated at US$6.4 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data