Economy and Climate Equity ADA Ramps Improvements
Sector: Power Transmission • Location: Seattle, Washington, United States of America
Source: Dodge
Economy and Climate Equity ADA Ramps Synopsis: This project provides for the improvement of Americans with Disabilities Act (ADA) pedestrian facilities along the Metro Transit RapidRide "H" Line corridor from SW Roxbury St. and 22nd Ave. SW to SW 110th St. and 16th Ave. SW in King County by clearing and grubbing, removing structures and obstructions, roadway excavation and removing asphalt pavemen
- Status
- Prospective
- Sector
- Power Transmission, Road, Commercial, Car parking, Government, Mass Transit, Power Generation (CCGT), Automotive
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Economy and Climate Equity ADA Ramps Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Economy and Climate Equity ADA Ramps Synopsis: This project provides for the improvement of Americans with Disabilities Act (ADA) pedestrian facilities along the Metro Transit RapidRide "H" Line corridor from SW Roxbury St. and 22nd Ave. SW to SW 110th St. and 16th Ave. SW in King County by clearing and grubbing, removing structures and obstructions, roadway excavation and removing asphalt pavement, adjusting utility boxes, placing and compacting crushed surfacing base course, and constructin... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Road, Commercial, Car parking, Government, Mass Transit, Power Generation (CCGT), Automotive |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
