logo
ProjectActive

Ecovia NW Bridge

Sector: Bridge • Location: Brazil

Source: International Finance Corporation (IFC)

The proposed investment is a bridge facility of up to BRL 700 million for Concessionária de Rodovias Noroeste Paulista S.A. (the “Company” or “EcoNoroeste”). The Company was established to operate, improve, and maintain 600 km of brownfield toll-road segments in the State of São Paulo in Brazil, under a 30-year concession awarded in 2022 (the “Project”). The Company is part of the Group Ecorodovia

Status
Prospective
Sector
Bridge, Manufacturing (Industrial), Road, Government
Location
Brazil
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Ecovia NW Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ecovia NW Bridge” is an infrastructure initiative in the Bridge sector, located in Brazil. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed investment is a bridge facility of up to BRL 700 million for Concessionária de Rodovias Noroeste Paulista S.A. (the “Company” or “EcoNoroeste”). The Company was established to operate, improve, and maintain 600 km of brownfield toll-road segments in the State of São Paulo in Brazil, under a 30-year concession awarded in 2022 (the “Project”). The Company is part of the Group Ecorodovias, a leading Brazilian toll roads operator, which is majority owned by ASTM with a 51.9% shareholding interest. ASTM is an Italian company controlled by the Italian industrial group, Gruppo Gavio, and participated by the French asset manager, ArdianThe Project will be implemented in multiple locations in the state of São Paulo, Brazil. The roads involved are SP-310, SP-333, SP-323, SP-351, and SP-326, in their stretches located between São Carlos, São José do Rio Preto, and Barretos.The proceeds will partially finance the payment of the upfront concession fee (BRL 1.29 billion) and the initial investments upon the concession agreement’s execution (c. BRL 3.0 billion). The concession's capex includes, among others, (i) 123km of road duplications, (ii) 147km of additional lanes, (iii) 26km of frontage roads, (iv) 75km of bicycle paths, (v) other works such as intersections, footbridges, truck drivers rest areas, and (vi) operational equipment purchase.  Construction activities are expected to start in 2024. Around 50% of these investments take place during the first 6 years, with some additional duplications in 2038 and major maintenance during the whole period.  The existing roads under the concession were built in the 1970s and expanded in the early 2000s.

Original sector

E-BC - Highway Operations (Includes Toll Roads)

Procurement method

Location

Country

Brazil

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Bridge, Manufacturing (Industrial), Road, Government

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project