logo

Ecovia NW Bridge

Sector: Bridge • Location: Brazil

Source: International Finance Corporation (IFC)

Project
Active

The proposed investment is a bridge facility of up to BRL 700 million for Concessionária de Rodovias Noroeste Paulista S.A. (the “Company” or “EcoNoroeste”). The Company was established to operate, improve, and maintain 600 km of brownfield toll-road segments in the State of São Paulo in Brazil, under a 30-year concession awarded in 2022 (the “Project”). The Company is part of the Group Ecorodovia

Project Information FAQ

Project Information

5 Q
The project “Ecovia NW Bridge” is an infrastructure initiative in the Bridge sector, located in Brazil. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed investment is a bridge facility of up to BRL 700 million for Concessionária de Rodovias Noroeste Paulista S.A. (the “Company” or “EcoNoroeste”). The Company was established to operate, improve, and maintain 600 km of brownfield toll-road segments in the State of São Paulo in Brazil, under a 30-year concession awarded in 2022 (the “Project”). The Company is part of the Group Ecorodovias, a leading Brazilian toll roads operator, which is majority owned by ASTM with a 51.9% shareholding interest. ASTM is an Italian company controlled by the Italian industrial group, Gruppo Gavio, and participated by the French asset manager, ArdianThe Project will be implemented in multiple locations in the state of São Paulo, Brazil. The roads involved are SP-310, SP-333, SP-323, SP-351, and SP-326, in their stretches located between São Carlos, São José do Rio Preto, and Barretos.The proceeds will partially finance the payment of the upfront concession fee (BRL 1.29 billion) and the initial investments upon the concession agreement’s execution (c. BRL 3.0 billion). The concession's capex includes, among others, (i) 123km of road duplications, (ii) 147km of additional lanes, (iii) 26km of frontage roads, (iv) 75km of bicycle paths, (v) other works such as intersections, footbridges, truck drivers rest areas, and (vi) operational equipment purchase.  Construction activities are expected to start in 2024. Around 50% of these investments take place during the first 6 years, with some additional duplications in 2038 and major maintenance during the whole period.  The existing roads under the concession were built in the 1970s and expanded in the early 2000s.                                                   

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data