logo

EDC Palinpinon II Geothermal Plant

Sector: Geothermal • Location: Negros Oriental, Philippines

Source: World Bank Group

Project
Active

Energy Development Corporation (EDC), privatized in 2006, was developing the Palinpinon II geothermal plant in Palinpinon Town, Negros Oriental. The plant was to consist of 20MW capacity.

The project was to be commissioned in 2014. In 2011 however, the company announced that their other geothermal plant, the Northern Negros (49MW) commissioned in 2007 was only producing 5-10MW and that the plant

Status
Prospective
Sector
Geothermal, Power Generation (CCGT), Commercial, Warehouse, Manufacturing (Industrial), Government
Location
Negros Oriental, Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EDC Palinpinon II Geothermal Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EDC Palinpinon II Geothermal Plant” is an infrastructure initiative in the Geothermal sector, located in Negros Oriental, Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Energy Development Corporation (EDC), privatized in 2006, was developing the Palinpinon II geothermal plant in Palinpinon Town, Negros Oriental. The plant was to consist of 20MW capacity. The project was to be commissioned in 2014. In 2011 however, the company announced that their other geothermal plant, the Northern Negros (49MW) commissioned in 2007 was only producing 5-10MW and that the plant was to be decommissioned after being shut down in November 2011, and the equipment transfered to the 20MW Nasulo site, where it could be used to generate up to 45MW. The impairment cost were P5 billion, assumed to be additional to the development cost of the original 20MW plant. The original plant was to be commissioned in 2008. The project applied for UNFCCC CDM financing in December 2006 at a total cost of US$40.2 million. Of this amount, US$24.8 million was financed by the Development Bank of the Philippines (DBP), and the remainder via internal cash generation of EDC. The original plant reached financing before it was privatized however, so that amount has been accounted for in the divestiture of EDC. The expansion is listed here. http://newsinfo.inquirer.net/86631/more-geothermal-power-in-negros

Original sector

Energy

Budget

Location

Country

Philippines

State

Negros Oriental

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT), Commercial, Warehouse, Manufacturing (Industrial), Government

Article published date

2024-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project