EDD Infrastructure Upgrade
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
Major components of Project Work consist of remodeling of existing public and employee toilet rooms; removal and replacement of accessible drinking fountains; removal and replacement of room signage; removal and replacement of door hardware at non-compliant doors; upgrade of existing accessible parking stalls; installation of electric vehicle charging stations; removal of existing flat built-up ro
- Status
- Closed
- Sector
- Automotive, Electric Vehicles (EVs), Cement, Power Generation (CCGT), Residential, Commercial, Car parking, Manufacturing (Industrial)
- Location
- Pasadena, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about EDD Infrastructure Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major components of Project Work consist of remodeling of existing public and employee toilet rooms; removal and replacement of accessible drinking fountains; removal and replacement of room signage; removal and replacement of door hardware at non-compliant doors; upgrade of existing accessible parking stalls; installation of electric vehicle charging stations; removal of existing flat built-up roof system to the concrete deck and replacement of with single ply roofing system. Removal and rep... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Pasadena |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Electric Vehicles (EVs), Cement, Power Generation (CCGT), Residential, Commercial, Car parking, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
