EDF Geycek Wind Farm
Sector: Wind • Location: Turkey
Source: World Bank Group
Akuo Energy was planning the development of the 168 MW Geycek wind farm, near Kirsehir, Northcentral Turkey. The project was to comprise 44 turbines of 3.4 MW. Akuo Energy was the Turkish subsidiary of the French wind power developer Perfect Wind. Perfect Wind was in turn part of Spanish Iberdrola. In December 2012, when the project reached closure, the project was reported as being developed by E
- Status
- Prospective
- Sector
- Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about EDF Geycek Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Akuo Energy was planning the development of the 168 MW Geycek wind farm, near Kirsehir, Northcentral Turkey. The project was to comprise 44 turbines of 3.4 MW. Akuo Energy was the Turkish subsidiary of the French wind power developer Perfect Wind. Perfect Wind was in turn part of Spanish Iberdrola. In December 2012, when the project reached closure, the project was reported as being developed by EDF Energies Nouvelles, and Polat Enerji Sanayi ve Ticaret AS. Annual output was estimated at 384 GWh. Commissioning of the project was expected in late-2011, but construction did not start until 2013. Equipment was supplied by German REpower Systems under a contract signed in April 2010 with Al-Yel Elektrik, a subsidiary of Akuo Energy. Under the supply contract, REpower Systems was assigned the service and maintenance of the turbines for the first 12 years of the project. Project developer Al-Yel Elektrik received a 25 year production license in May 2008. The EPC contract was now awarded to Enercon and Siemens. The project reached financial closure in December (20th) 2012. Total project cost was estimated at US$254 million. Debt was provided by Garanti Bankasi, US$191 million. The remaining US$63 million was equity. The legal advisors to the sponsor were Fidan & Fidan Law Firm. http://www.polatenerji.com/eng/download/uretimlisans/geycek_eng.pdf http://www.polatenerji.com/eng/f_geycek.php |
Original sector | Energy |
Budget |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
