logo

EDF Geycek Wind Farm

Sector: Wind • Location: Turkey

Source: World Bank Group

Project
Active

Akuo Energy was planning the development of the 168 MW Geycek wind farm, near Kirsehir, Northcentral Turkey. The project was to comprise 44 turbines of 3.4 MW. Akuo Energy was the Turkish subsidiary of the French wind power developer Perfect Wind. Perfect Wind was in turn part of Spanish Iberdrola. In December 2012, when the project reached closure, the project was reported as being developed by E

Status
Prospective
Sector
Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EDF Geycek Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EDF Geycek Wind Farm” is an infrastructure initiative in the Wind sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Akuo Energy was planning the development of the 168 MW Geycek wind farm, near Kirsehir, Northcentral Turkey. The project was to comprise 44 turbines of 3.4 MW. Akuo Energy was the Turkish subsidiary of the French wind power developer Perfect Wind. Perfect Wind was in turn part of Spanish Iberdrola. In December 2012, when the project reached closure, the project was reported as being developed by EDF Energies Nouvelles, and Polat Enerji Sanayi ve Ticaret AS. Annual output was estimated at 384 GWh. Commissioning of the project was expected in late-2011, but construction did not start until 2013. Equipment was supplied by German REpower Systems under a contract signed in April 2010 with Al-Yel Elektrik, a subsidiary of Akuo Energy. Under the supply contract, REpower Systems was assigned the service and maintenance of the turbines for the first 12 years of the project. Project developer Al-Yel Elektrik received a 25 year production license in May 2008. The EPC contract was now awarded to Enercon and Siemens. The project reached financial closure in December (20th) 2012. Total project cost was estimated at US$254 million. Debt was provided by Garanti Bankasi, US$191 million. The remaining US$63 million was equity. The legal advisors to the sponsor were Fidan & Fidan Law Firm. http://www.polatenerji.com/eng/download/uretimlisans/geycek_eng.pdf http://www.polatenerji.com/eng/f_geycek.php

Original sector

Energy

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Raw Materials, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project