EDF La Ventosa
Sector: Raw Materials • Location: Mexico
Source: International Finance Corporation (IFC)
Eléctrica del Valle de México S. de R.L. de C.V. (“EVM” or the “Company”), an affiliate of Électricité de France (“EDF”), is currently developing and constructing a 67.5 MW greenfield wind power plant that consists of the installation of 27 Clipper “Liberty” wind turbine generators with a nominal capacity of 2.5 MW each, an associated substation and control facilities, and a 115 kV transmission l
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Eléctrica del Valle de México S. de R.L. de C.V. (“EVM” or the “Company”), an affiliate of Électricité de France (“EDF”), is currently developing and constructing a 67.5 MW greenfield wind power plant that consists of the installation of 27 Clipper “Liberty” wind turbine generators with a nominal capacity of 2.5 MW each, an associated substation and control facilities, and a 115 kV transmission line from the Project site to the Juchitán II substation of Comisión Federal de Electricidad (“the Project”). The Project is located in the Ejidos (communally-owned lands) of La Mata and La Ventosa in the Isthmus of Tehuantepec, 15 km north of the city of Juchitán in the State of Oaxaca, Mexico. The Isthmus of Tehuantepec has one of the most prolific wind resources globally, and the Project is expected to produce approximately 290 GWh annually on average over a 10 year period, which corresponds to approximately 49% capacity utilization. The Project is being developed under Mexico’s self-supply or “autoabastecimiento” framework and will sell its energy to four subsidiaries of Wal-Mart de Mexico S. A.B. de C.V. under 15-year self supply power purchase agreements. The Project is configured as a line of 20 turbines in La Mata and a separate line of seven turbines in La Ventosa, both of which are approximately 2.5 km from nearest community. Total physical Project footprint with affect approximately 16 hectares (that is, less than 0.05% of total Ejido land in La Mata and La Ventosa). Currently, there are approximately a total 14 wind projects in different stages of development by different companies in the Isthmus, including the 250 MW EURUS wind power Project developed by Acciona, which is also being considered for IFC investment under a different operation. Project construction is reaching completion: all 27 turbines are erected, the substation and control facilities are complete and the transmission line is completed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
