EdgeConneX Data Center Campus Master Report
One of 10,000+ projects Taiyo tracks in Arizona.
Source: Dodge USA
EdgeConneX would build the campus through three proposed data hall buildings, more than 1 million sq ft (92,900 sqm) as well as an on-site electrical substation on about 93 acres within Mesa's Elliot Road Technology Corridor. Built over three phases, the facilities would serve a range of clients from colocation to single-tenant.
- Status
- Closed
- Sector
- Data Center, Residential, Manufacturing (Industrial), Power Generation (CCGT), Road, Commercial
- Location
- Mesa, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about EdgeConneX Data Center Campus Master Report
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | EdgeConneX would build the campus through three proposed data hall buildings, more than 1 million sq ft (92,900 sqm) as well as an on-site electrical substation on about 93 acres within Mesa's Elliot Road Technology Corridor. Built over three phases, the facilities would serve a range of clients from colocation to single-tenant. |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Mesa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Data Center, Residential, Manufacturing (Industrial), Power Generation (CCGT), Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Data Center projects in United States of America
- PHASE 1-DATA CENTER TENANT IMPROVMENT-101,934SF INTERIOR DATA CENTER AND OFFICE,EXTER.STNBY GEN&WATER TANK
- PHASE 3-DATA CENTER- ENCOMPASSING OF PART OF 3RD FLOOR AHU ELECTRICAL ROOM,BATTERY ROOM,INSALL GENERATORS&EQUIP IN YARD
- Finnegan, Henderson, Farabow, Garrett & Dunner, LLP
- CNA Headquarters
- COPT DC-6
- MOON-Light Project
- The ASU BRoadening Access through Community, Connectivity, and Education (BRACCE) initiative
- Construction of a data center campus for a multinational technology corporation in Jakarta, Indonesia
