Edged Data Center PH 1 (Project Inabi)
Sector: Commercial • Location: Bluffdale, Utah, United States of America
Source: Dodge USA
Office space and equipment halls on the interior of the building. Generator yards, loading docks and other ancillary equipment will be provided on the exterior of the buildings with screening walls and fencing as required - at Phase 1 is proposed 14 to have two stories and be 50 feet in height. Phase 2 will be three or four stories and potentially up to 90 feet in height
- Status
- Closed
- Sector
- Commercial, Data Center, Residential, Manufacturing (Industrial)
- Location
- Bluffdale, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Edged Data Center PH 1 (Project Inabi)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Office space and equipment halls on the interior of the building. Generator yards, loading docks and other ancillary equipment will be provided on the exterior of the buildings with screening walls and fencing as required - at Phase 1 is proposed 14 to have two stories and be 50 feet in height. Phase 2 will be three or four stories and potentially up to 90 feet in height |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Bluffdale |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Data Center, Residential, Manufacturing (Industrial) |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
