logo
ProjectPre-Design

Edgewood Drive Reconstruction Maple - Whittier

Sector: Power Transmission • Location: Neenah, Wisconsin, United States of America

Source: Dodge USA

Edgewood Drive (Maple - Whittier) 2,218 ft. (3.4) Reconstruct. Coordinate with utility construction.

Status
Prospective
Sector
Power Transmission, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
Location
Neenah, Wisconsin, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Edgewood Drive Reconstruction Maple - Whittier

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Edgewood Drive Reconstruction Maple - Whittier” is an infrastructure initiative in the Power Transmission sector, located in Neenah, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Edgewood Drive (Maple - Whittier) 2,218 ft. (3.4) Reconstruct. Coordinate with utility construction.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Neenah

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-07-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project