Edgewood Elementary School Replacement
Sector: Waste Processing and Treatment • Location: Fruitport, Michigan, United States of America
Source: Dodge
Primary School. Sub-bids to Construction Manager November 23 at 2:00 PM (EST) Construction expected to start April 1, 2027
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Forest Products and Packaging, Education, Cable car, Power Generation (CCGT), Consumer Products, Biomass, Water Supply and Storage, Steel, Metal, Power Transmission, Commercial, Manufacturing (Industrial), Rail, Warehouse, Automotive, Cement, Road, Telecommunications, Government, Residential
- Location
- Fruitport, Michigan, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Edgewood Elementary School Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | sub bidding, design development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Primary School. Sub-bids to Construction Manager November 23 at 2:00 PM (EST) Construction expected to start April 1, 2027 |
Original sector | Education |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Fruitport |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Forest Products and Packaging, Education, Cable car, Power Generation (CCGT), Consumer Products, Biomass, Water Supply and Storage, Steel, Metal, Power Transmission, Commercial, Manufacturing (Industrial), Rail, Warehouse, Automotive, Cement, Road, Telecommunications, Government, Residential |
Article published date | 2026-11-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
