Ediz Hook Revetment SOURCES SOUGHT
Sector: Water Supply and Storage • Location: Port Angeles, Washington, United States of America
Source: Dodge
Ediz Hook Revetment USACE Seattle District requires placement of up to 100,000 tons of beach nourishment material on the ocean side of the Ediz Hook Revetment located in Port Angeles, WA. Construction activities must occur during the in-water construction work window of 16 July 2025 through 15 February 2026. Construction is expected to use excavators, dump trucks, bulldozers, and similar equipment
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Seaport, Commercial
- Location
- Port Angeles, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Ediz Hook Revetment SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ediz Hook Revetment USACE Seattle District requires placement of up to 100,000 tons of beach nourishment material on the ocean side of the Ediz Hook Revetment located in Port Angeles, WA. Construction activities must occur during the in-water construction work window of 16 July 2025 through 15 February 2026. Construction is expected to use excavators, dump trucks, bulldozers, and similar equipment. Dump trucks and trailers would transport equipment and materials to the Ediz Hook. Beach nouris... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Port Angeles |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Seaport, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
