Edmonds Combined Cured In Place Pipe Rehabilitation
Sector: Water Supply and Storage • Location: Edmonds, Washington, United States of America
Source: Dodge
the construction of the 2625 Combined Cured in Place Pipe CIPP Rehabilitation Project and the furnishing of ail labor, materials, and equipment necessary for this project. The project covered by these specifications and bid documents involves six schedules A - Sewer, B - Sewer, C - Sewer, D - Sewer, Sewer Bid Alternate, and F - Stormwater in the construction of the City of Edmonds Phase 12 Sewer a
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Edmonds, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Edmonds Combined Cured In Place Pipe Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | the construction of the 2625 Combined Cured in Place Pipe CIPP Rehabilitation Project and the furnishing of ail labor, materials, and equipment necessary for this project. The project covered by these specifications and bid documents involves six schedules A - Sewer, B - Sewer, C - Sewer, D - Sewer, Sewer Bid Alternate, and F - Stormwater in the construction of the City of Edmonds Phase 12 Sewer and Phase 5 Stormwater Replacement and Rehabilitation Project. This project consists of: Phase 12 ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Edmonds |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
