Edmonton EcoPark Waste-to-Energy Plant
Sector: Manufacturing (Industrial) • Location: London, United Kingdom
Source: Industrial Info Resources
Replacement of an older waste-to-energy plant in north London with a new facility capable of processing up to 700,000 metric tons of nonrecyclable waste annually, generating 78 MW of power and heat for local homes. The project was in planning and engineering for over a decade before construction started in late 2022 and is expected to be completed in the first half of 2027.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Power Generation (CCGT)
- Location
- London, United Kingdom
- Updated
- 22 Jul 2026
- Source
- Industrial Info Resources
ConstructChat
Ask ConstructChat about Edmonton EcoPark Waste-to-Energy Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of an older waste-to-energy plant in north London with a new facility capable of processing up to 700,000 metric tons of nonrecyclable waste annually, generating 78 MW of power and heat for local homes. The project was in planning and engineering for over a decade before construction started in late 2022 and is expected to be completed in the first half of 2027. |
Original sector | Power |
Budget |
Location
Country | United Kingdom (UK) |
City | London |
Source
Source | Industrial Info Resources |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2026-07-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
