Edmonton Organics Processing Facility PPP project
One of 10,000+ projects Taiyo tracks in Alberta.
Source: InfraPPPWorld
This project includes design, build, finance, operation, and maintenance of the Edmonton Organics Processing Facility in Alberta. The scope of the project involves the construction of a new anaerobic digestion facility at the Edmonton Waste Management Centre (EWMC), as well as upgrades to the existing utility infrastructure and the system which turns biogas produced into renewable natural gas. The
- Status
- Under Construction
- Sector
- Water Supply and Storage, Natural Gas, Power Transmission, Biomass, Power Generation (CCGT), Waste Processing and Treatment, Government
- Location
- Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Edmonton Organics Processing Facility PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | project in tender |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes design, build, finance, operation, and maintenance of the Edmonton Organics Processing Facility in Alberta. The scope of the project involves the construction of a new anaerobic digestion facility at the Edmonton Waste Management Centre (EWMC), as well as upgrades to the existing utility infrastructure and the system which turns biogas produced into renewable natural gas. The facility will expand the City of Edmonton’s organic waste processing capacity to 140,000 tonnes per year and contribute to reaching the City’s target to divert 90 percent of waste from landfills. |
Original sector | Water & Waste |
Procurement method |
Location
Country | Canada |
State | Alberta |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Natural Gas, Power Transmission, Biomass, Power Generation (CCGT), Waste Processing and Treatment, Government |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
