logo

Edson South 2021 NGTL System Expansion

Sector: Chemical (Industrial) • Location: Edson, Alberta, Canada

Source: Dodge USA

Project
Start

Edson South Area 125 km of 48-inch (1219 mm) pipeline and 3 Compressor Unit Additions to the Edson Mainline

Status
Under Construction
Sector
Chemical (Industrial), Oil and Gas, Commercial, Manufacturing (Industrial)
Location
Edson, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Edson South 2021 NGTL System Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Edson South 2021 NGTL System Expansion” is an infrastructure initiative in the Chemical (Industrial) sector, located in Edson, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Edson South Area 125 km of 48-inch (1219 mm) pipeline and 3 Compressor Unit Additions to the Edson Mainline

Budget

Location

Country

Canada

State

Alberta

City

Edson

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Chemical (Industrial), Oil and Gas, Commercial, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project