Education Building (Alteration)
One of 10,000+ projects Taiyo tracks in New York.
Source: Dodge USA
Alteration consists of modifying the existing 5th FL setback exterior terrace on The Charter School, occupied floor to provide additional passive recreation space. A 10' high transparent welded wire fence and new rubber flooring will be installed.
- Status
- Under Construction
- Sector
- Education, Commercial, Manufacturing (Industrial)
- Location
- Woodstock, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Education Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Alteration consists of modifying the existing 5th FL setback exterior terrace on The Charter School, occupied floor to provide additional passive recreation space. A 10' high transparent welded wire fence and new rubber flooring will be installed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Woodstock |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Education, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
