logo

EDUCATION I

Sector: Government • Location: Tunisia

Source: World Bank Group

Project
Closed

The Education Project for Tunisia development objective is to provide assistance for the most urgent requirements of the Tunisian school system by firstly, provide financing for the construction of six middle and secondary schools. These schools are urgently needed to reduce overcrowding and to enable teachers who are already on the job to be used more effectively. Secondly, while the schools are

Project Information FAQ

Project Information

5 Q
The project “EDUCATION I” is an infrastructure initiative in the Government sector, located in Tunisia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Education Project for Tunisia development objective is to provide assistance for the most urgent requirements of the Tunisian school system by firstly, provide financing for the construction of six middle and secondary schools. These schools are urgently needed to reduce overcrowding and to enable teachers who are already on the job to be used more effectively. Secondly, while the schools are being constructed, a second phase of the program will be carried out simultaneously to determine how construction costs can be held down or reduced for the remainder of the school construction program. It is believed that important savings may be possible by the standardization of the basic units common to various types of schools or by the more effective use of space. A team of experts will prepare the specific design for model secondary schools of various types and at the and at same time a basic manual will be prepared. By the time the architectural and construction team has produce the basic manual it will be possible, on a more certain basis than now, for the Tunisian Government to formulate its expansion plans, taking into account the results of these two activities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data