Education II Preparation Study (Taa)
One of 2,237 projects Taiyo tracks in Zambia.
Source: African Development Bank (AfDB)
The study will: 1) define the policy and operational guidelines relating to primary education and school building and maintenance aspects of the project; 2) review the current Science/technical curricula in relation to manpower requirements and teacher supply and define training programmes relating to primary teacher education; 3) produce detailed architectural and engineering designs required
- Sector
- Commercial, Education, Government
- Location
- Zambia
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Education II Preparation Study (Taa)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The study will: 1) define the policy and operational guidelines relating to primary education and school building and maintenance aspects of the project; 2) review the current Science/technical curricula in relation to manpower requirements and teacher supply and define training programmes relating to primary teacher education; 3) produce detailed architectural and engineering designs required under the project with related tender and contract documents; 4) produce a comprehensive list of physical requirements and related tender and contract documents. |
Original sector | Education |
Budget |
Location
Country | Zambia |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Zambia
- Open for FDI through a majority stake/Development of a new project/Production, transmission and distribution of electricity/DEVELOPMENT OF CHIPOTA FALLS 200 KW MINI-HYDRO PROJECT
- Development of the 118.4MW Hydro Electricity Plant and Associated Transmission Facilities in Zambia
- RISE AND SHINE SCHOOL PROJECT
- Sale of Majoru Investments Limited
- Luswishi Farm Project
- Shangombo Sugar Project
- Reliable Supply of Beef and Pork to Local and Foreign Shops
- Umlimi Char-Briquettes Project
