logo

EDWALENI POWER

Sector: Mass Transit • Location: Eswatini

Source: World Bank Group

Project
Closed

The Edwaleni Power Project in Swaziland will assist in financing the cost of construction and associated electricity transmission lines, which will be developed by the Swaziland Electricity Board (SEB).The project will provide power through an interconnected system to the urban areas, and to a new iron ore mine 12 miles west of Mbabane on the western border of Swaziland. It will be the first stage

Project Information FAQ

Project Information

5 Q
The project “EDWALENI POWER” is an infrastructure initiative in the Mass Transit sector, located in Eswatini. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Edwaleni Power Project in Swaziland will assist in financing the cost of construction and associated electricity transmission lines, which will be developed by the Swaziland Electricity Board (SEB).The project will provide power through an interconnected system to the urban areas, and to a new iron ore mine 12 miles west of Mbabane on the western border of Swaziland. It will be the first stage of the SEB program, which will provide power through an integrated system to the urban areas of Imbabane, Nirnzini, and Mhlambanyati; to a railway village at Sidvokodvo, and the Big Bend area; along with furnishing power to the new iron ore mine. The territory is beginning to develop economically and considerable advancement can be expected over the next 10 years. Economic conditions appear excellent for growth in fields which will produce substantial power demands.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data