Edward Street Bridge Replacement
Sector: Commercial • Location: Thunder Bay, Ontario, Canada
Source: Dodge USA
Scope of Work includes but is not limited to removal of the existing structure, salvaging centre span girders, refacing existing abutments, new 36m single span precast concrete box girder bridge on H-Pile with sidewalks and new metal rail, catch basin manhole adjustment, concrete curb gutter, concrete sidewalk, guiderail, asphalt, pavement marking, and site restoration
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Scope of Work includes but is not limited to removal of the existing structure, salvaging centre span girders, refacing existing abutments, new 36m single span precast concrete box girder bridge on H-Pile with sidewalks and new metal rail, catch basin manhole adjustment, concrete curb gutter, concrete sidewalk, guiderail, asphalt, pavement marking, and site restoration |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
