EES Coke Battery Expansion
The owner, status and timeline of this project. A free account opens every field.
Source: Michigan Public
The EES Coke Battery facility in River Rouge is seeking a permit to install additional equipment, including a screener to sort and separate materials. This project is expected to increase particulate pollution by over 2.5 tons per year, which includes finer particles that pose health risks.
- Status
- Prospective
- Sector
- Energy Storage, Manufacturing (Industrial)
- Location
- River Rouge, Michigan, United States of America
- Updated
- 19 Nov 2026
- Source
- Michigan Public
ConstructChat
Ask ConstructChat about EES Coke Battery Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The EES Coke Battery facility in River Rouge is seeking a permit to install additional equipment, including a screener to sort and separate materials. This project is expected to increase particulate pollution by over 2.5 tons per year, which includes finer particles that pose health risks. |
Original sector | Environment |
Location
Country | United States of America (USA) |
State | Michigan |
City | River Rouge |
Source
Source | Michigan Public |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Manufacturing (Industrial) |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
