EESTI ENERGIA DISTRIBUTION NETWORK
Sector: Electric Vehicles (EVs) • Location: Estonia
Source: European Investment Bank (EIB)
The project will finance part of Eesti Energia on-going investment programme in Estonia during the period 2019-2023. Financing will be used to extend and refurbish the electricity distribution networks, including investments in public lighting and charging stations for electric vehicles to take place in the same period.
- Status
- Under Construction
- Sector
- Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Government
- Location
- Estonia
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about EESTI ENERGIA DISTRIBUTION NETWORK
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will finance part of Eesti Energia on-going investment programme in Estonia during the period 2019-2023. Financing will be used to extend and refurbish the electricity distribution networks, including investments in public lighting and charging stations for electric vehicles to take place in the same period. |
Original sector | Energy |
Location
Country | Estonia |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in Estonia
- Bikeep
- Elven Technologies
- Rakvere linna vee- ja kanalisatsioonitrasside rekonstrueerimine
- Tehvandi uue K90 suusahüppemäe kompleksi II etapi ehitustööd
- Europe's Largest Rare-Earth Magnet Factory in Narva
- Neo Performance Materials Rare Earth Magnet Plant
- Feasibility study of a high energy BATtery with novel Metallic lithium ANode
- Eesti Energia Bond
