EESTI ENERGIA POWER DISTRIBUTION NETWORKS
Sector: Power Generation (CCGT) • Location: Estonia
Source: European Investment Bank (EIB)
Investment programme aiming at reinforcing and modernising the electricity distribution network in Estonia by connecting new supply points, improving overall reliability and safety, as well as introducing smart meter infrastructure.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Government
- Location
- Estonia
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about EESTI ENERGIA POWER DISTRIBUTION NETWORKS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Investment programme aiming at reinforcing and modernising the electricity distribution network in Estonia by connecting new supply points, improving overall reliability and safety, as well as introducing smart meter infrastructure. |
Original sector | Energy |
Location
Country | Estonia |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
