logo

EFELER Geothermal Power Plant Capacity Extension (97.6MW)

Sector: Commercial • Location: Turkey

Source: World Bank Group

Project
Active

The project involves the expansion of the EFELER, Turkey’s largest geothermal power plant by adding 3 new units of total 97.6 MW capacity. The plant is located in western Turkey, in the region of the Büyük Menderes Graben basin Gurmat Elektrik Uretim AS, a subsidiary of Güris Holding, will receive a package of $ 350 million from multilateral and commercial banks as follows: $ 100 million loan from

Project Information FAQ

Project Information

5 Q
The project “EFELER Geothermal Power Plant Capacity Extension (97.6MW)” is an infrastructure initiative in the Commercial sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the expansion of the EFELER, Turkey’s largest geothermal power plant by adding 3 new units of total 97.6 MW capacity. The plant is located in western Turkey, in the region of the Büyük Menderes Graben basin Gurmat Elektrik Uretim AS, a subsidiary of Güris Holding, will receive a package of $ 350 million from multilateral and commercial banks as follows: $ 100 million loan from the the Asian Infrastructure Investment Bank (AIIB), $ 60 million loan from the European Bank for Reconstruction and Development (EBRD), $ 20 million loan from the Black Sea Trade and Development Bank (BSTDB), $ 90 million loan from Türkiye Is Bankasi (Isbank), $ 50 million from the Industrial Development Bank of Turkey TSKB and $ 30 million from ICBC Turkey. Financial close was announced on 25 July 2019. When fully completed in 2020, the 8 units of the plant will have a total installed capacity of 260 MW. https://www.ebrd.com/news/2019/aiib-ebrd-and-bstdb-cofinance-expansion-of-turkeys-largest-geothermal-power-plant-.html https://www.aiib.org/en/news-events/news/2019/20190725_001.html https://www.bstdb.org/our-projects/project-search/project-summary?ProjectID=OP/18/0065

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data