logo

EFELER Geothermal Power Plant Capacity Extension (97.6MW)

Sector: Geothermal • Location: Turkey

Source: World Bank Group

Project
Active

The project involves the expansion of the EFELER, Turkey’s largest geothermal power plant by adding 3 new units of total 97.6 MW capacity. The plant is located in western Turkey, in the region of the Büyük Menderes Graben basin Gurmat Elektrik Uretim AS, a subsidiary of Güris Holding, will receive a package of $ 350 million from multilateral and commercial banks as follows: $ 100 million loan from

Status
Prospective
Sector
Geothermal, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EFELER Geothermal Power Plant Capacity Extension (97.6MW)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EFELER Geothermal Power Plant Capacity Extension (97.6MW)” is an infrastructure initiative in the Geothermal sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the expansion of the EFELER, Turkey’s largest geothermal power plant by adding 3 new units of total 97.6 MW capacity. The plant is located in western Turkey, in the region of the Büyük Menderes Graben basin Gurmat Elektrik Uretim AS, a subsidiary of Güris Holding, will receive a package of $ 350 million from multilateral and commercial banks as follows: $ 100 million loan from the the Asian Infrastructure Investment Bank (AIIB), $ 60 million loan from the European Bank for Reconstruction and Development (EBRD), $ 20 million loan from the Black Sea Trade and Development Bank (BSTDB), $ 90 million loan from Türkiye Is Bankasi (Isbank), $ 50 million from the Industrial Development Bank of Turkey TSKB and $ 30 million from ICBC Turkey. Financial close was announced on 25 July 2019. When fully completed in 2020, the 8 units of the plant will have a total installed capacity of 260 MW. https://www.ebrd.com/news/2019/aiib-ebrd-and-bstdb-cofinance-expansion-of-turkeys-largest-geothermal-power-plant-.html https://www.aiib.org/en/news-events/news/2019/20190725_001.html https://www.bstdb.org/our-projects/project-search/project-summary?ProjectID=OP/18/0065

Original sector

Energy

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project