logo

EFFICIENT UTILITY INFRASTRUCTURE KLAGENFURT

Sector: Power Transmission • Location: Austria

Source: European Investment Bank (EIB)

Project
Signed

The project comprises the promoter’s investments from 2014 to 2018 in its existing district heat and water grids located in the city of Klagenfurt (Austria). Concerning the district heating component, investments are related to the refurbishment of the district heating system, its expansion to new clients, and a substantial change of heat supply. The latter comprises the following key measures

Project Information FAQ

Project Information

4 Q
The project “EFFICIENT UTILITY INFRASTRUCTURE KLAGENFURT” is an infrastructure initiative in the Power Transmission sector, located in Austria. Taiyo aggregates data on it from European Investment Bank (EIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

signed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the promoter’s investments from 2014 to 2018 in its existing district heat and water grids located in the city of Klagenfurt (Austria). Concerning the district heating component, investments are related to the refurbishment of the district heating system, its expansion to new clients, and a substantial change of heat supply. The latter comprises the following key measures and is expected to lead to a significant increase in renewable energy use (mainly cogeneration based): • Conversion of a large heavy fuel oil fired base load cogeneration plant in the city centre, that is at the end of its technical lifetime, into a 120 MWth natural gas fired plant and peak load boiler; • Installation of a new oil or gas fired reserve and peak load heating plant (presumably around 30 MWth) in the West of the city, including grid connection; and • Installation of a grid connection to a new biomass cogeneration plant (around 50 MWth) in the East of the city which will become the system’s base load heat supplier in future (the biomass cogeneration plant itself is outside the scope of this operation because it will be implemented by a third party based on a long term heat-offtake agreement with the promoter). The water related investments, mainly replacement of distribution pipes, will ensure the efficiency of the distribution system. Other investments in the water treatment system will ensure compliance with European Drinking water standards. The promoter also intends to undertake a cross-border project to reduce water losses in the transmission systems.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data