logo
ProjectSigned

EFFICIENT UTILITY INFRASTRUCTURE KLAGENFURT

One of 3,761 projects Taiyo tracks in Austria.

Source: European Investment Bank (EIB)

The project comprises the promoter’s investments from 2014 to 2018 in its existing district heat and water grids located in the city of Klagenfurt (Austria). Concerning the district heating component, investments are related to the refurbishment of the district heating system, its expansion to new clients, and a substantial change of heat supply. The latter comprises the following key measures

Status
Under Construction
Sector
Power Transmission, Biomass, Water Supply and Storage, Natural Gas, Oil and Gas, Power Generation (CCGT), Government
Location
Austria
Updated
22 Jul 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about EFFICIENT UTILITY INFRASTRUCTURE KLAGENFURT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “EFFICIENT UTILITY INFRASTRUCTURE KLAGENFURT” is an infrastructure initiative in the Power Transmission sector, located in Austria. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Sponsoring Agency

Status

Original status

signed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project comprises the promoter’s investments from 2014 to 2018 in its existing district heat and water grids located in the city of Klagenfurt (Austria). Concerning the district heating component, investments are related to the refurbishment of the district heating system, its expansion to new clients, and a substantial change of heat supply. The latter comprises the following key measures and is expected to lead to a significant increase in renewable energy use (mainly cogeneration based): • Conversion of a large heavy fuel oil fired base load cogeneration plant in the city centre, that is at the end of its technical lifetime, into a 120 MWth natural gas fired plant and peak load boiler; • Installation of a new oil or gas fired reserve and peak load heating plant (presumably around 30 MWth) in the West of the city, including grid connection; and • Installation of a grid connection to a new biomass cogeneration plant (around 50 MWth) in the East of the city which will become the system’s base load heat supplier in future (the biomass cogeneration plant itself is outside the scope of this operation because it will be implemented by a third party based on a long term heat-offtake agreement with the promoter). The water related investments, mainly replacement of distribution pipes, will ensure the efficiency of the distribution system. Other investments in the water treatment system will ensure compliance with European Drinking water standards. The promoter also intends to undertake a cross-border project to reduce water losses in the transmission systems.

Original sector

Water, sewerage, Energy

Location

Country

Austria

Source

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Power Transmission, Biomass, Water Supply and Storage, Natural Gas, Oil and Gas, Power Generation (CCGT), Government

Article published date

2025-11-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project