EFT Stanari Coal Plant
Sector: Power Generation (CCGT) • Location: Bosnia and Herzegovina
Source: World Bank Group
Energy Financing Team (EFT) developed the 300MW coal-fired power plant Stanari, in Northern Bosnia. Annual output was estimated at 2,000 GWh. The fuel, lignite, is expected to be sourced from nearby mines - where the lignite only holds small amounts of sulfur.
The developer held a 30 year concession won in a competitive tender in 2008. Commissioning was expected for 2015/2016. The EPC contract wa
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government, Commercial
- Location
- Bosnia and Herzegovina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about EFT Stanari Coal Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Energy Financing Team (EFT) developed the 300MW coal-fired power plant Stanari, in Northern Bosnia. Annual output was estimated at 2,000 GWh. The fuel, lignite, is expected to be sourced from nearby mines - where the lignite only holds small amounts of sulfur. The developer held a 30 year concession won in a competitive tender in 2008. Commissioning was expected for 2015/2016. The EPC contract was awarded to Dongfang Electric Corporation (China). Construction started in December 2012. The project will connect to the grid via the Banja Luka/Tuzla transmission line. Power plant availability was expected to be 90%. Collenco Stenmuller worked on the feasibility study. Stanari is a merchant power plant. Total project cost was estimated at EUR500 million (US$661.9 million). The project received EUR350 million (US$ 463 million) from the China Development Bank, December 2012. The remainder of project cost was to be financed through equity. http://www.eft-group.net/index.php/news/single/9/EFT-completes-financial-close-for-the-Stanari-TPP-project |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Bosnia and Herzegovina |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Commercial |
Article published date | 2024-05-24 |
Research
Free account
View all details