logo

EG-Ain Sokhna Power Project

Sector: Water Supply and Storage • Location: Egypt, Arab Republic of

Source: World Bank Group

Project
Closed

The objective of the Ain Sokhna Power Project for Egypt, Arab Republic of is to ensure continuous electricity supply to meet demand in a sustainable manner through investment in new generation capacity. There are two components to the project. The first component is the Ain Sokhna power plant. The project includes the following: (i) two 650 MW steam turbine generators; (ii) two steam generators (o

Project Information FAQ

Project Information

5 Q
The project “EG-Ain Sokhna Power Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Ain Sokhna Power Project for Egypt, Arab Republic of is to ensure continuous electricity supply to meet demand in a sustainable manner through investment in new generation capacity. There are two components to the project. The first component is the Ain Sokhna power plant. The project includes the following: (i) two 650 MW steam turbine generators; (ii) two steam generators (once-through supercritical boilers); (iii) electrical equipment including transformers and switchyard; (iv) auxiliary mechanical equipment including pumps and drives, heat exchangers and de-aerators, critical piping, and piping valves; (v) water and wastewater treatment systems and desalination plant; (vi) the implementation of the Environmental and Social Management Plan (ESMP), including environmental monitoring equipment; (vii) distributed control systems and instrumentation; (viii) engineering and project management services including design, procurement and construction supervision as well as commissioning, testing, and start-up; and (ix) civil works, yard tanks as well as medium and low voltage switchgear. The second component is the technical assistance. The technical assistance component is aimed at further enhancing the on-going energy sector policy dialogue with Government of Egypt (GOE). The assistance will mainly comprise of studies and policy support including rapid response support to Egyptian Electricity Holding Company (EEHC) in the implementation of the time-of-use tariff and further tariff adjustment recommendations from the on-going energy pricing strategy work.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data