EG House / Play Arquitetura
Sector: Cement • Location: Brazil
Source: ArchDaily
The leisure area, on the other hand, required a new structure, made with metallic I-profiles, both for the beams and for the pillars. This new area extends to the west and its volume was conceived so that it emerged from ‘inside’ the void of the old porch, without interfering with the existing concrete structure. The upper slab of the advance is below the concrete beams of the house and a deck was
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The leisure area, on the other hand, required a new structure, made with metallic I-profiles, both for the beams and for the pillars. This new area extends to the west and its volume was conceived so that it emerged from ‘inside’ the void of the old porch, without interfering with the existing concrete structure. The upper slab of the advance is below the concrete beams of the house and a deck was proposed on the floor above the previously existing floor. A few steps and a large bench make the transition to the second part of the deck, built over the garden and below a pergola.Located on the outskirts ofBelo Horizonte, the house was built on a lot with a steep slope, and its program was distributed over three floors. It was decided to locate the garage and the intimate area (4 bedrooms, being 2 suites and 2 semi-suites) on the lower floor so that a garden terrace connected to the social area and the kitchen could be created on the middle floor. The office and TV room are located on the top floor, as well as another terrace overlooking the mountains.Text description provided by the architects.The project for this house was developed in two different moments: the initial project made in 2008/2009 and executed afterward (the work was completed in 2011), and the reform project and completion of the interiors carried out between 2020 and 2022. Between one stage and another, the owners moved from Brazil, the two children became grew up and the house was almost sold.The new project took into account some characteristics of the house and the land; the kitchen grew to the limit of the existing concrete eaves, requiring a new cut in the sloping ground. To minimize the slope’s angle of inclination, it was established that the external garden would be five centimeters below the window sill of the new kitchen and would be used as a vegetable garden.The interior design mixes vintage furniture, contemporary pieces, and some items designed by Play Arquitetura.The refurbishment involved the expansion of the kitchen and the leisure area connected to it, in addition to the creation of a mixed-use bathroom (for leisure and service). The somewhat lean dimensions of the original kitchen and the balcony, associated with a setting sunlight that further limited the use of the kitchen, led the owners to request the modification. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
