EG Irrigation Improvement
Closed · Egypt, Arab Republic of
Source: World Bank Group
The overall objectives of the Irrigation Improvement Project are to: 1) increase agricultural production and farmers income by improving the irrigation infrastructure, facilitating a more equitable distribution of water, and improved on-farm water managment; 2) improve the long-term sustainability, through takeover of responsibility for the operation and maintenance of the tertiary level irrigatio
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Waste Processing and Treatment, Raw Materials, Government
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about EG Irrigation Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The overall objectives of the Irrigation Improvement Project are to: 1) increase agricultural production and farmers income by improving the irrigation infrastructure, facilitating a more equitable distribution of water, and improved on-farm water managment; 2) improve the long-term sustainability, through takeover of responsibility for the operation and maintenance of the tertiary level irrigation system by the farmers and their sharing in the costs for the tertiary level investments; and 3) strengthen the institutional planning and implementation capacity of the Ministry of Public Works and Water Resources in the irrigation subsector. The project comprises the improvement of three irrigation command areas serving a total net irrigable area of about 248,000 feddan. The subprojects are Mahmoudia in Baheira Governorate; Manaifa; and El Wasat in Kafr El-Sheikh Governorate. Existing delivery system of main and secondary canals will be improved and provided with control structures, telemetry system and mixing stations installed for reuse of drainage effluent. The tertiary systems will be developed with provision of single lift pumps, lined or pvc pipe tertiary laterals. An irrigation advisory service will be established to assist with organization and training of farmers into water users groups at tertiary level and water users' associations at the secondary level. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration |
Budget |
Location
Country | Egypt |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
