logo
ProjectClosed

EG Irrigation Improvement

Closed · Egypt, Arab Republic of

Source: World Bank Group

The overall objectives of the Irrigation Improvement Project are to: 1) increase agricultural production and farmers income by improving the irrigation infrastructure, facilitating a more equitable distribution of water, and improved on-farm water managment; 2) improve the long-term sustainability, through takeover of responsibility for the operation and maintenance of the tertiary level irrigatio

Status
Closed
Sector
Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Waste Processing and Treatment, Raw Materials, Government
Location
Egypt
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EG Irrigation Improvement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EG Irrigation Improvement” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The overall objectives of the Irrigation Improvement Project are to: 1) increase agricultural production and farmers income by improving the irrigation infrastructure, facilitating a more equitable distribution of water, and improved on-farm water managment; 2) improve the long-term sustainability, through takeover of responsibility for the operation and maintenance of the tertiary level irrigation system by the farmers and their sharing in the costs for the tertiary level investments; and 3) strengthen the institutional planning and implementation capacity of the Ministry of Public Works and Water Resources in the irrigation subsector. The project comprises the improvement of three irrigation command areas serving a total net irrigable area of about 248,000 feddan. The subprojects are Mahmoudia in Baheira Governorate; Manaifa; and El Wasat in Kafr El-Sheikh Governorate. Existing delivery system of main and secondary canals will be improved and provided with control structures, telemetry system and mixing stations installed for reuse of drainage effluent. The tertiary systems will be developed with provision of single lift pumps, lined or pvc pipe tertiary laterals. An irrigation advisory service will be established to assist with organization and training of farmers into water users groups at tertiary level and water users' associations at the secondary level.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration

Budget

Location

Country

Egypt

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project