logo

Egied Van Broeckhoven School / B2Ai

Sector: Steel • Location: Belgium

Source: ArchDaily

Project
Closed

A school that connects people - The demand for Dutch-language education is high in Brussels. For years, Flanders has invested significantly in creating additional capacity. In a city like Brussels, where space is limited and many school buildings are outdated, this challenge is even greater. The project was commissioned by the 'Ignatius Scholen in Beweging' association. The location chosen was the

Project Information FAQ

Project Information

4 Q
The project “Egied Van Broeckhoven School / B2Ai” is an infrastructure initiative in the Steel sector, located in Belgium. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A school that connects people - The demand for Dutch-language education is high in Brussels. For years, Flanders has invested significantly in creating additional capacity. In a city like Brussels, where space is limited and many school buildings are outdated, this challenge is even greater. The project was commissioned by the 'Ignatius Scholen in Beweging' association. The location chosen was the former Vandenheuvel brewery near the West Station in Sint-Jans-Molenbeek. With the closure of the brewery, an important economic driver for the neighbourhood came to a halt. The conversion into a brand-new secondary school provides a powerful new impetus for both the area and its surroundings.Text description provided by the architects.In the multicultural neighbourhood surrounding the West Station in Sint-Jans-Molenbeek, the Egied Van Broeckhoven School has opened in the former bottling plant of the Vandenheuvel brewery. The brand-new Jesuit school will be rooted in the community and offers innovative Dutch-language secondary education focused on STEM, and Community and Well-being. Once fully operational, the school will accommodate 860 students across academic, technical and vocational streams. With this circular renovation and new construction project, the architects of B2Ai have realised the ambitions of the school, centred on sustainability, smart infrastructure and community connection. The project was executed within the DBFM procedure of the Flemish Government and is the first of around 40 school construction projects to be completed and operationalised.When allocating architecture programmes, the unique qualities of the spaces were considered. The old bottling hall, for instance, with its high ceilings and arched roof, houses an open learning environment, workshops and an auditorium. Inside, the industrial character remains palpable. The brewery's concrete structure has been left visible, blending old and new seamlessly. B2Ai's interior designers combined playful elements like ochre-grey chequered flooring with warm materials such as pine wood.An open and inclusive school - A school is more than just a building. The Egied Van Broeckhoven School seeks to avoid isolation and opens itself up to the community. The new sports hall is placed adjacent to the existing building, making it visible from the street. Positioned semi-underground, the sports hall intrigues passers-by and engages with the neighbourhood. The limited space pushed the team to think innovatively. The playground, for instance, is distributed over multiple levels. On top of the sports hall is a large outdoor play area, separated by arches fitted with ball-catching nets. Facilities such as sports fields and the gym are available for sports clubs and community initiatives outside school hours.Sustainable reuse of industrial heritage - As much as possible, the existing industrial heritage has been preserved. The Art Deco façades were cleaned and insulated to meet stringent energy performance standards. The exterior joinery was replaced with new aluminium frames. Respecting the industrial heritage, a strong vertical window design with slender profiles reminiscent of the original steel windows was chosen. The green-grey colour gives the façade a contemporary touch. To maximise natural daylight in the deep building, a patio was introduced within the grid of concrete beams and columns.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data