logo

Eglinton Crosstown West Extension (ICIP Funding)

Sector: Tunnel • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The project will provide a rapid transit connection from the western terminus of the Eglinton Crosstown Light Rail Transit (ECLRT) to the Mississauga’s MiWay Bus Rapid Transit service at Renforth Gateway in Mississauga. The project will create a single rapid transit connection from Kennedy Station in Scarborough through to downtown Mississauga and will address the following issues: i) increased co

Project Information FAQ

Project Information

4 Q
The project “Eglinton Crosstown West Extension (ICIP Funding)” is an infrastructure initiative in the Tunnel sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will provide a rapid transit connection from the western terminus of the Eglinton Crosstown Light Rail Transit (ECLRT) to the Mississauga’s MiWay Bus Rapid Transit service at Renforth Gateway in Mississauga. The project will create a single rapid transit connection from Kennedy Station in Scarborough through to downtown Mississauga and will address the following issues: i) increased coverage, access and network resilience; and ii) community growth and development. The project scope includes new construction of a 9 kilometre, double-track, transit alignment with 6 kilometres of tunneled sections and the rest of the alignment above-grade; The construction components will be delivered via two separate contracts: 1) Advance Tunneling Works contracts and 2) Stations, Rail and Systems (SRS) contract. The proposed scope of the SRS works includes, but is not limited to, installation and construction of the following features to “fit-out” the tunneled and above-grade sections: • 7 stations/terminals, • 1 bridge/elevated guideway, • 6 emergency exit buildings, • 10 cross passages, • 6 traction power substations, • 3 tunnel portals, • installation of intelligent traffic system (ITS) for vehicle monitoring and controls as well as terminal monitoring; and • fleet procurement. The project will result in improved capacity of public transit infrastructure, improved quality and/or safety of existing or future transit systems and access to the public transit system in Toronto, Ontario. The project will also result in Increased access to clean energy transportation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data