EGY. EFFICIENCY & RE
Sector: Power Generation (CCGT) • Location: Malaysia
Source: World Bank Group
With the recent sharp decline in foreign exchange earnings, Malaysia is facing severe resource constraints. In light of these, the National Electricity Board of the States of Malaya's (NEB) immediate concern is to maximize the operational efficiency of its existing facilities and optimize the use of the country's energy resources. The Energy Efficiency and Plant Rehabilitation Project seeks to a
- Status
- Closed
- Sector
- Power Generation (CCGT), Oil and Gas, Hydro, Geothermal, Government, Natural Gas
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about EGY. EFFICIENCY & RE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | With the recent sharp decline in foreign exchange earnings, Malaysia is facing severe resource constraints. In light of these, the National Electricity Board of the States of Malaya's (NEB) immediate concern is to maximize the operational efficiency of its existing facilities and optimize the use of the country's energy resources. The Energy Efficiency and Plant Rehabilitation Project seeks to achieve these objectives, through emphasis on improving the efficiency of thermal power stations, replacing oil with natural gas as the primary fuel for power generation, introducing a more effective maintenance management system for thermal and hydro power plants, rationalizing the transmission system, modernizing system operation and control, and furthering specific institutional capabilities. The project specifically includes: (a) rehabilitation of 1,290 MW of plant at Tuanku Jaafar, Prai and Sultan Iskandar from oil to oil/gas firing; and (c) introduction of computerized maintenance management systems at all major thermal and hydro stations. It also provides for the (d) modernization of the national load dispatch center; (e) installation of regional distribution control centers; (f) installation of transmission lines; (g) installation of nine substations; and (h) technical assistance. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Malaysia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Oil and Gas, Hydro, Geothermal, Government, Natural Gas |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
