logo

EGY. EFFICIENCY & RE

Sector: Power Generation (CCGT) • Location: Malaysia

Source: World Bank Group

Project
Closed

With the recent sharp decline in foreign exchange earnings, Malaysia is facing severe resource constraints. In light of these, the National Electricity Board of the States of Malaya's (NEB) immediate concern is to maximize the operational efficiency of its existing facilities and optimize the use of the country's energy resources. The Energy Efficiency and Plant Rehabilitation Project seeks to a

Status
Closed
Sector
Power Generation (CCGT), Oil and Gas, Hydro, Geothermal, Government, Natural Gas
Location
Malaysia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EGY. EFFICIENCY & RE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EGY. EFFICIENCY & RE” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

With the recent sharp decline in foreign exchange earnings, Malaysia is facing severe resource constraints. In light of these, the National Electricity Board of the States of Malaya's (NEB) immediate concern is to maximize the operational efficiency of its existing facilities and optimize the use of the country's energy resources. The Energy Efficiency and Plant Rehabilitation Project seeks to achieve these objectives, through emphasis on improving the efficiency of thermal power stations, replacing oil with natural gas as the primary fuel for power generation, introducing a more effective maintenance management system for thermal and hydro power plants, rationalizing the transmission system, modernizing system operation and control, and furthering specific institutional capabilities. The project specifically includes: (a) rehabilitation of 1,290 MW of plant at Tuanku Jaafar, Prai and Sultan Iskandar from oil to oil/gas firing; and (c) introduction of computerized maintenance management systems at all major thermal and hydro stations. It also provides for the (d) modernization of the national load dispatch center; (e) installation of regional distribution control centers; (f) installation of transmission lines; (g) installation of nine substations; and (h) technical assistance.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Malaysia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Oil and Gas, Hydro, Geothermal, Government, Natural Gas

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project