logo

Egypt - Abu Qir 1300 Mw Steam Power Project

Sector: Power Generation (CCGT) • Location: Egypt

Source: African Development Bank (AfDB)

Project

Abu Qir project aims to increase the installed power generation capacity in Egypt by 1300 MW, to become available to the national grid in 2012, thus increasing the grid capacity by 4%. The project is part of the 2007 – 2012 power sector investment plan to increase power supply in order to accommodate the expected growth in the demand. This Abu Qir power plant project (with a total capacity of 1300

Project Information FAQ

Project Information

4 Q
The project “Egypt - Abu Qir 1300 Mw Steam Power Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Egypt. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Abu Qir project aims to increase the installed power generation capacity in Egypt by 1300 MW, to become available to the national grid in 2012, thus increasing the grid capacity by 4%. The project is part of the 2007 – 2012 power sector investment plan to increase power supply in order to accommodate the expected growth in the demand. This Abu Qir power plant project (with a total capacity of 1300 MW) represents 18.6% of the targeted capacity increase in the Egypt expansion plan. Demand for electricity has been growing steadily in Egypt at about 7% per year as a result of economic and demographic growths. With universal access to electricity throughout the country through the national grid, electrification plays a significant role in supporting socio-economic development and service delivery. The project main components comprises: (A) Civil Works; (B) Supply and Installation of Equipment: (B.1) Steam Turbine Generators & Condensers, (B.2) Steam Generators & Auxiliaries, (B.3) Mechanical Equipment/Pipe Installation, (B.4) Electrical Equipment/Instrument & Control Installation, and (B.5) 500 kV Switchyard; (C) Environmental Monitoring; (D) Project Management; and (E) Wrap-up Insurance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data