Egypt - Bilharzia Control Project III
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The present project relates the Bilharzia Control Project III. It's designed in order to reach the Nile Delta area, which was the only major region in Egypt that are not covered by systematic control programs. The main outputs of the project are the snail reducing in areas of high risk and capacity strengthening of health services to treat bilharzia cases. The project comprises six (06) components
- Sector
- Government
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Egypt - Bilharzia Control Project III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present project relates the Bilharzia Control Project III. It's designed in order to reach the Nile Delta area, which was the only major region in Egypt that are not covered by systematic control programs. The main outputs of the project are the snail reducing in areas of high risk and capacity strengthening of health services to treat bilharzia cases. The project comprises six (06) components namely: 1) Training; 2) Equipment; 3) Drugs; 4) Transportation; 5) Mollusciciding; and 6) Scientific monitoring. |
Original sector | Health |
Budget |
Location
Country | Egypt |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
