Egypt - Cairo West Power
One of 5,002 projects Taiyo tracks in Egypt.
Source: African Development Bank (AfDB)
The present is relates to the Cairo West Power. A study launched by the Egyptian Electricity Authority (EEA) in 1986 to determine the least cost option for capacity addition recommended that a 700 MW thermal power plant be constructed as an extension of Cairo West existing units (4 x 87. 5) MW. This led to the design of the present project. The project consists of the procurement and installation
- Sector
- Oil and Gas, Power Generation (CCGT), Geothermal, Natural Gas, Raw Materials, Manufacturing (Industrial), Government
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Egypt - Cairo West Power
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present is relates to the Cairo West Power. A study launched by the Egyptian Electricity Authority (EEA) in 1986 to determine the least cost option for capacity addition recommended that a 700 MW thermal power plant be constructed as an extension of Cairo West existing units (4 x 87. 5) MW. This led to the design of the present project. The project consists of the procurement and installation of two dual fuel (natural gas/ oil) steam units (5 and 6) in the existing Cairo West Power station and effecting the necessary modifications to existing facilities. In addition, the availability of electric energy is the basis for development of the industrial and agriculture sectors as well as the social development and raising the standard of living. |
Original sector | Energy |
Budget |
Location
Country | Egypt |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Power Generation (CCGT), Geothermal, Natural Gas, Raw Materials, Manufacturing (Industrial), Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
