logo

Egypt - Comprehensive Study and Project Preparation for The Nubaria and Ismailia Canals

Sector: Manufacturing (Industrial) • Location: Egypt

Source: African Development Bank (AfDB)

Project

The present project is relative to the comprehensive study and project preparation for the Nubaria and Ismailia Canals. The study is critical to address serious issues confronting these two regions and to make recommendations. This study should also allow to provide viable solutions to reverse the physical deterioration and poor performance of canal infrastructure and to improve the operation and

Project Information FAQ

Project Information

4 Q
The project “Egypt - Comprehensive Study and Project Preparation for The Nubaria and Ismailia Canals” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Egypt. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present project is relative to the comprehensive study and project preparation for the Nubaria and Ismailia Canals. The study is critical to address serious issues confronting these two regions and to make recommendations. This study should also allow to provide viable solutions to reverse the physical deterioration and poor performance of canal infrastructure and to improve the operation and maintenance of the irrigation systems. The project should seek technically feasible and economically and socially viable solutions for efficient water control and system management in these two canals, concentrating on the main canal system only. The present study comprises pre-feasibility and feasibility level work, to include developing semi-detailed designs, bills of quantities, cost estimates and tender document preparation so that major investment operations for both Nubaria and Ismailia canals can follow immediately upon conclusion of the study.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data