Egypt - Feasibility Study and Capacity, Building for the Use of Renewable Energy for Pumping Irrigation Water Project
Sector: Water Supply and Storage • Location: Egypt
Source: African Development Bank (AfDB)
The Feasibility Study and Capacity Building for the Use of Renewable Energy for Pumping Irrigation Water Project was initiated by the Arab Republic of Egypt with the support of the Middle East and North Africa Transition Fund (MENA TF) which managed by African Development Bank. This study includes four components, namely : (i) undertaking comprehensive feasibility study for the use of renewable en
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Feasibility Study and Capacity Building for the Use of Renewable Energy for Pumping Irrigation Water Project was initiated by the Arab Republic of Egypt with the support of the Middle East and North Africa Transition Fund (MENA TF) which managed by African Development Bank. This study includes four components, namely : (i) undertaking comprehensive feasibility study for the use of renewable energy for pumping irrigation water by analyzing different technology and systems (i.e. mainly solar energy), and assessing the potential of other options (i.e. wind); (ii) provide advisory services to the procurements of the national reclamation project components and support the Executive Agency for the preparation of tender documents for irrigation hybrid energy system; (iii) implement two pilot areas at Toushka and Moghra and implement metrological measurements for the use of solar and wind energy or hybrid systems; and (iv) provide capacity building and training for MWRI/GWS/PS staff on the design/implementation/operation and maintenance for renewable energy use for pumping irrigation water. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
