logo

Egypt - Master Plan for the rehabilitation/replacement of hydraulic control structures on the Nile

Sector: Raw Materials • Location: Egypt

Source: African Development Bank (AfDB)

Project

The master plan study for the rehabilitation/replacement of major hydraulic structures on the nile is designed in order to ensure an efficient planning of future interventions. Availability of a Master Plan as envisaged under the proposed study should assist the Government of Egypt (GoE) in efficiently planning future capital investment interventions and the mobilization of the resources required

Project Information FAQ

Project Information

4 Q
The project “Egypt - Master Plan for the rehabilitation/replacement of hydraulic control structures on the Nile” is an infrastructure initiative in the Raw Materials sector, located in Egypt. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The master plan study for the rehabilitation/replacement of major hydraulic structures on the nile is designed in order to ensure an efficient planning of future interventions. Availability of a Master Plan as envisaged under the proposed study should assist the Government of Egypt (GoE) in efficiently planning future capital investment interventions and the mobilization of the resources required for the improvement of the over 200 old but vital hydraulic structures on the Nile. This study consists of three main components: i) site investigations and the development of a Geographic Information System (GIS) database, detailed inspections and data collection for 200 hydraulic structures in 75 locations; ii) safety evaluations and the development of a Decision Support System (DSS); and iii) the development of a dynamic Master Plan, the undertaking of a Strategic Environmental Assessment (SEA) of the Master Plan and the preparation of a capital investment project for one priority major structure identified under the study. Its area covers the location of the following structures: (a) 11 Main barrages on the Nile River; (b) 21 Head regulators at the off-takes of canals from the Nile; (c) 44 Intermediate regulators within Major canals; (d) 124 smaller structures located within irrigation canals.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data