logo

Egypt - Navigation Line between Lake Victoria And Mediterranean Sea - Feasibility Study Phase 2 - Part1

Sector: Residential • Location: Egypt

Source: African Development Bank (AfDB)

Project

The VICMED is a Presidential Infrastructure Championing Initiative (PICI), championed by the Arab Republic of Egypt and was approve by the NEPAD Heads of State and Government Orientation Committee (HSGOC) and the AU Assembly during the AU Summit in January 2013 in Addis, Ababa, Ethiopia. The project fits within a regional programme of COMESA, and has been prioritised by the respective member count

Project Information FAQ

Project Information

4 Q
The project “Egypt - Navigation Line between Lake Victoria And Mediterranean Sea - Feasibility Study Phase 2 - Part1” is an infrastructure initiative in the Residential sector, located in Egypt. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The VICMED is a Presidential Infrastructure Championing Initiative (PICI), championed by the Arab Republic of Egypt and was approve by the NEPAD Heads of State and Government Orientation Committee (HSGOC) and the AU Assembly during the AU Summit in January 2013 in Addis, Ababa, Ethiopia. The project fits within a regional programme of COMESA, and has been prioritised by the respective member countries as it is expected to contribute to the delivery of economic infrastructure necessary for achieving tangible development outcomes for the Nile River footprint countries. The project seeks to enable navigation along river Nile from Lake Victoria to the Mediterranean Sea providing riparian states access to the sea. Besides deepening regional integration, the project will provide a shorter and direct transport route between Western Europe and, Eastern and Central Africa which is relatively cheaper and environmentally friendly. The activities for which the NEPAD-IPPF assistance is requested concern part of the Feasibility Study covering Part 1 of Phase 2 which will include collection of preliminary engineering information on basin hydrology, topography, bathymetric, geological and geotechnical data; preparation of the Strategic Environmental and Social Assessment Report, financing the Project Management Unit (PMU) operations and project audit. The estimated overall duration of the Feasibility Study (Phase 2 – Part 1) is 30 months from Grant Approval. The total cost is estimated at USD2,100,000.00. From this amount, NEPAD-IPPF will provide USD2,000,000.00 (95%) and counterpart contribution of USD100,000.00 from GOE (5%) will be provided by the GOE in kind.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data