logo
Project

Egypt - Power Project phase I

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The major part of the project consists of intalling new power plant for the city of port Said. The plant will be equipped with two gas turbines each of a maximum rating of 23.45 MW. Each turbine will be delivered with its generator, transformer as well as complete set of accessoiries. The manufacturer will be asked to erect each set on a base plate and with the necessary encasement in such a way

Sector
Commercial, Power Generation (CCGT), Wind, Government
Location
Egypt
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Egypt - Power Project phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Egypt - Power Project phase I” is an infrastructure initiative in the Commercial sector, located in Egypt. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The major part of the project consists of intalling new power plant for the city of port Said. The plant will be equipped with two gas turbines each of a maximum rating of 23.45 MW. Each turbine will be delivered with its generator, transformer as well as complete set of accessoiries. The manufacturer will be asked to erect each set on a base plate and with the necessary encasement in such a way that the only civil works to be done in Port Said will be the building of the foundation for the placement of the units. In addition, a small building has to be constructed for equipment control and for the switching panel which will connect the new units with the existing 11 KV distribution network in the city.

Original sector

Energy

Budget

Location

Country

Egypt

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Wind, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project